ASTM A179 Seamless Carbon Steel Pipe
Sep 14, 2023 Inspection-Report-Of-ASTM-A179-1.pdf
Product Description
ASTM A179 Seamless Carbon Steel Pipe Specification
|
item |
value |
|
Place of Origin |
China |
|
Brand Name |
GNEE |
|
Application |
Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe, Other |
|
Alloy Or Not |
Is Alloy |
|
Section Shape |
Round |
|
10mm - 1000mm |
|
|
Special Pipe |
API Pipe, Other |
|
Thickness |
0.5-10mm |
|
Standard |
JIS |
|
Length |
12M, 6m, 1-6M |
|
Certificate |
API, ce, BIS, JIS, GS, ISO9001 |
|
Grade |
SA-53A/SA-53B/A500B/SA-178A/SA-178C/SA-106B |
|
Surface Treatment |
Cold Rolled/Hot Rollled |
|
Tolerance |
±5%, ±1% |
|
Processing Service |
Bending, Welding, Decoiling, Punching, Cutting |
|
Oiled or Non-oiled |
Slightly Oiled |
|
Invoicing |
by actual weight |
|
Delivery Time |
8-14 days |
|
Product name |
Seamless Pipe Tube |
|
Steel Grade |
Grade B/X42/X52/X60/X70 L245/L290/S320/L360/L390/L415 |
|
Material |
SA-53A/SA-53B/A500B/SA-178A/SA-178C/SA-106B |
|
Shape |
Round Shape |
|
Thickness |
0.5 - 10 Mm |
|
Surface |
Smooth |
|
Technology |
Cold Rolled.hot Rolled |
|
Color |
Black....as Customers' Requirement |
|
Keyword |
steel pipe seamless |
|
MOQ |
1 Ton |

FAQ
Q: Are you a trading company or a manufacturer?
A: We are a professional steel pipe manufacturer, and our company is also a very professional and skilled steel product foreign trade company. We have 15 years of export experience, competitive prices and best after-sales service. In addition to this, we can provide a wide range of steel products to meet customer requirements.
Q: Can you send samples?
A: Of course, we can send samples to all over the world, our samples are free, but customers need to bear the express cost.
Q: About the product price?
A: Due to cyclical changes in raw material prices, prices vary in different periods. You can send the products you need to our email and we will give you a quotation as soon as possible.
Q: How long does your delivery time take?
A: Generally, our delivery time is within 7-25 days, it may be delayed if the demand is large or there are special circumstances.
ABOUT US
GNEE Group is a large-scale steel production and sales company located in Anyang City, Henan Province, one of the eight ancient capitals of China. The company is an enterprise that produces stainless steel pipes, galvanized pipes, anti-corrosion pipes, spiral welded pipes and other steel pipes. Through 15 years of development, it is committed to providing customers with high-quality steel pipe products and meticulous and comprehensive services. The company has reached cooperation with customers in more than 150 countries and regions. Our products and services have been recognized by customers. We insist on high quality and honest cooperation, and strive to build the company into the most internationally competitive supply chain group in the world.





