Petroleum Casing Hydrostatic Pressure Test Procedure
Jan 23, 2024
Each pipe shall be hydrostatically tested over its entire length after thickening (if applicable) and heat treatment (if applicable) and shall reach at least the hydrostatic test pressure specified in 10.12.2 without leakage. The full pressure test state should be maintained for no less than 5 seconds. For electric welded pipes, the pipe welds should be checked for leaks under full pressure. The threading shop shall perform a full-length hydrostatic test of the pipe (or make arrangements for this test) unless a full-length test has been previously performed at at least the pressure required for the pipe end condition. The test should be carried out in one of the following conditions:
a) Flat-end, non-thickened pipes that will no longer undergo thickening or heat treatment;
b) Heat-treated flat-end non-thickened tube;
c) Flat-end pipes that will not undergo heat treatment after thickening;
If this type of pipe has been tested over its entire length under the test pressure with threads and couplings in the plain-end state before thickening, the pressure test at the thickened part may be used behind the heated pipe section during thickening. A pressure test plug seal test device is carried out.
d) Flat-end thickened pipe after heat treatment;
e) Pipe with thread but without coupling;
f) Threaded and machine-tight coupling pipe.
For pipes requiring heat treatment, the test should be carried out after heat treatment. The test pressure for all pipes with threaded ends shall be at least that with threads and couplings.

After being machined to the flat end size and after any heat treatment, the test shall be carried out with the flat end or with threads.
The testing machine should be equipped with devices to ensure that the specified test pressure and time interval requirements are met. Test pressure measuring devices shall be calibrated using a static pressure testing machine or equivalent equipment within 4 months before each use. Calibration and verification records should be kept in accordance with 13.4.
Pup joints made from a single piece of tubing or casing that has been previously hydrostatically tested are not required to be hydrostatically tested if they are not subsequently heat treated.

Note 1: The surface of martensitic chromium steel is easily scratched, so special measures may need to be taken to treat the thread surface and/or apply lubricating oil to minimize surface damage during the hydrostatic test (plug loading and unloading). Low.
Note 2: Various types of hydraulic test systems are available. It is the responsibility of the factory performing hydrostatic testing to develop a testing procedure to ensure that the possibility of damage to the pipe and the threads of the pipe and couplings is minimized.