SA335P11 Alloy Steel Pipe Welding And Heat Treatment
Feb 26, 2024
- Isolation layer heat treatment
1. Heat treatment
Stress-relieving heat treatment should be carried out immediately after the welding of the isolation layer is completed. If it cannot be carried out immediately, post-heating should be carried out before the pipe is cooled to room temperature. See Table 4 for heat treatment parameters. The heat treatment adopts resistance heating local heat treatment, and the heat treatment equipment must be able to automatically control and adjust the temperature.
During preheating, the resistance wire is arranged around the pipe at least 20mm away from the edge of the groove, wrapped with inorganic insulation cotton, and tied with iron wire to fix it. The distance between the resistance wire and the edge of the groove should not be too large, and the thermocouples should be arranged evenly up and down during heating.

2. Precautions
Attention should be paid during heat treatment:
(1) Preheat to the specified temperature and keep warm for half an hour before starting welding.
(2) Post-heating is required when post-weld heat treatment cannot be carried out immediately.
(3) If the welding stops midway for some reason, preheating and postheating should be restarted according to the original requirements.
(4) When the post-weld heat treatment heating temperature is below 300°C, the heating rate is not required.
(5) After post-weld heat treatment, cool down to ≤300℃, stop powering, and allow natural cooling; cool down to ≤100℃ and remove the heating device.

(6) Keep curve records for all preheating, postheating and postweld heat treatments.
(7) The temperature measuring end of the thermocouple should be close to the weld and avoid contact with the heating tape.
The insulation cotton should at least completely cover the heating tape.