Steel Pipe 15CrMo in Stock

Sep 18, 2023

Product Description

15CrMo steel is a low alloy steel known for its high temperature strength and corrosion resistance. Its composition usually includes 15% chromium (Cr), 1% molybdenum (Mo), other elements such as carbon (C), manganese (Mn), silicon (Si) and trace amounts of other alloying elements.

Steel Pipe 15CrMo in stock Specification

product name

Steel Pipe 15CrMo in stock

material

A36,A53,A106,A192,ST52,Q355,A210,T12,T11,P5,P9,P91,T22,A333,4140,5135 etc.

standard

AISI,ASTM,JIS,GB,DIN,EN,SUS,etc

OD(round)

8-1200mm or as request

thickness

1-200mm or as request

grade

1.7220,1.7336,1.2601,1.7380,1.7335,1.0033,1.0116 etc.

application

Widely used in construction, chemical, food, agriculture, ship parts and other industries.
Suitable for train, airplane, conveyer belt, vehicle, bolt, nut, spring, screen, etc.

payment terms

30% TT deposit and 70% LC the balance

delivery time

7-15 days after receving the deposit

packing

standard seaworthy packing or as request

 

Steel Pipe 15CrMo in stock

Company Profile

GNEE Group is located in Anyang City, Henan Province. It is a large steel enterprise integrating production, processing and sales.
Main products: carbon steel series, stainless steel series, special steel series. The products are divided into 300 series, 400 series stainless steel pipes, anti-corrosion pipes, galvanized pipes, alloy pipes, carbon steel pipes, etc. The company's annual sales volume exceeds 1 million tons, with sales hitting new highs repeatedly. The company has an experienced steel product marketing team. The company's products are well-known throughout the country for their good reputation, high-quality products, strong strength, and low prices, and their products are deeply relied on by users.

FAQ

Q1: Do you provide samples? Is it free or extra?
A: Yes, we can provide samples for free.

Q2: How long is your delivery time?
A: For inventory, we can send the goods to the loading port within 7 days after receiving the deposit;
For the production period, it usually takes 15 days ~21 days after receiving the deposit.

Q3: What are your payment terms?
A: Usually a 30% deposit is paid by wire transfer first, and the balance is paid against a copy of the L/C or a L/C payable on demand.