JCOE LSAW Steel Pipe Production Process

Feb 01, 2024 Inspection-Report-Of-LSAW-Pipe-converted.pdf

1. Full-plate ultrasonic inspection: After the steel plate enters the production line, full-plate ultrasonic inspection is first carried out to strictly control the quality of raw materials for the production of steel pipes.
2. Edge milling: A fully automatic, high-speed floating edge milling machine is used to perform double-sided milling on the two longitudinal edges of the steel plate to meet the processing requirements. The milling head has a floating profiling tracking function, which can automatically adjust the position of the milling head according to the flatness of the steel plate to ensure that both sides of the steel plate have the same bevel shape and size and obtain accurate plate width according to the diameter, laying the foundation for the diameter of the steel pipe.
3. Pre-bending: The pre-bending machine pre-bends the plate edge to a suitable curvature. The scientific design of the mold arc and transition section shape ensures that the plate edge is always in a pure bending deformation process during the pre-bending process. , no calendering occurs during thick plate processing, which is superior to roller bending machines and lays a good foundation for subsequent forming, welding and diameter expansion processes.
4. JCO forming method: First use a press to make half of the steel plate into a horizontal "J" shape, and then bend the other half step by step in multiple steps to form a horizontal "C" shaped tube embryo, with the opening of the tube tube gradually narrowing , becomes an open "O" shape, that is, a JCO molding process is completed. The JCO molding method uses fewer molds, the time for changing specifications is short, and the technology is relatively mature.

JCOE welded pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


5. Pre-welding: The pre-welding machine performs rapid joint pre-welding on open steel pipes, laying the foundation for ensuring the quality of internal and external submerged arc welding. The pre-welding method is a continuous pre-welding process for the entire length of the weld. At the same time, high-power continuous argon-rich gas shielded arc welding (MAG) and laser tracking equipment are used to ensure the quality of pre-welding and lay the foundation for internal and external welding. A good foundation.
6. Internal welding and external welding: The tandem multi-wire submerged arc welding device is used to weld the inside and outside of the steel pipe. Its characteristics are: high productivity, low pores and slag inclusion rate, small crack tendency, and good joint mechanical properties.
7. Ultrasonic flaw detection I: Perform 100% UT automatic flaw detection on the internal and external welds and the base metal on both sides of the weld.
8. X-ray flaw detection I: Conduct 100% X-ray industrial television flaw detection on internal and external welds, and use an image processing system to ensure the sensitivity of flaw detection.
9. One-time overall mechanical expansion of the steel pipe: expand, round, and straighten the entire length of the steel pipe to improve the geometric accuracy of the steel pipe and improve the distribution of stress within the steel pipe. Hydrostatic testing is performed on the expanded steel pipe. The hydraulic pressure test is conducted one by one, with the function of automatically recording and storing the test pressure and time. The column booster increases the water pressure in the pipe in a short time to ensure that the quality of the steel pipe meets the requirements.

welded steel pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


10. Ultrasonic flaw detection II: Carry out UT flaw detection on the welds and base materials on both sides again one by one to ensure the quality of the steel pipe after diameter expansion and hydraulic pressure, reliable flaw detection, and small detection blind zone.
11. X-ray flaw detection II: Take pictures of the pipe end welds of the steel pipes after diameter expansion and hydraulic pressure testing to ensure the quality of the steel pipes leaving the factory.
12. UT flaw detection at the pipe end: to ensure the quality of the steel pipe.
13. Chamfering: Bevel the pipe end of the steel pipe to ensure the quality of on-site butt welding of the steel pipe.