ASTM A 53 Carbon Schedule 40 Steel Pipes
ASTM A 53 Carbon Schedule 40 Steel Pipes
video
ASTM A 53 Carbon Schedule 40 Steel Pipes
ASTM A 53 Carbon Schedule 40 Steel Pipes
1/2
<< /span>
>

ASTM A 53 Carbon Schedule 40 Steel Pipes

The A 53 seamless steel pipe, a versatile metalwork component, is a key element in various industries, from oil and gas to construction and beyond. Withstanding extreme pressures and temperatures, this high-quality pipe offers exceptional strength and durability. Its unique properties make it an excellent choice for a range of applications, from pipelines to structural supports.

Gnee Steel (Tianjin) Co., Ltd. is one of the most reliable manufacturers and suppliers of astm a 53 carbon schedule 40 steel pipes in China, also supports customized service with low price. Welcome to wholesale discount astm a 53 carbon schedule 40 steel pipes for sale here from our factory. Contact us for free sample.

 

Alloy Steel Pipe:

The A 53 seamless steel pipe, a versatile metalwork component, is a key element in various industries, from oil and gas to construction and beyond. Withstanding extreme pressures and temperatures, this high-quality pipe offers exceptional strength and durability. Its unique properties make it an excellent choice for a range of applications, from pipelines to structural supports.

Products Description
Product Name
ASTM a 53 Carbon Schedule 40 Steel Black Iron Pipe Seamless Pipe
(O.D) Outer Diameter
20MM-762MM
(W.T)Wall thickness
0.5MM-20MM
Length
1M, 4M, 6M, 8M, 12M (accroding to the buyer's request)
Surface Treatment
Black paint ,red paint ,2PE, 3PE, Epoxy powder.
Standard
API, ASTM, bs, DIN, GB, API 5CT, API 5L, ASTM A106-2006, ASTM A53-2007, ANSI A182-2001, BS 6363, DIN 1629/3, DIN 1629/4, GB/T
8163-1999, GB/T 8162-1999, GB 6479-2000, Gb/t8163, GB/T3901, GB/T 3087, GB/T5310
Grade
10#-45#, 16mn, A53-A369, API J55-API P110, Q195-Q345, ST35-ST52, 20#, 45#, 16mn, A53(A,B), A106(B,C), API J55, Q345, ST37, ST52
Technique
Hot Rolled Or Cold Rolled
Package
Covered With Tarpaulin, Containers Or In Bulk
Certification
CE, BV, SGS, ISO9001, API
Delivery Time
stock or Usually within 10-45 days after receipt of advance payment

H5bd8ca60f8d04bce84643193d42f70b3ejpg720x720q50

FAQ

Q: How long is your delivery time?
A: It is according to quantity. Generally it is 30 days.

 

Q: Can you provide us sample, is it free or need to pay?
A: If you don't need to print your logo or other artwork on the products, we will not charge any cost, just tell us your freight collect account like Fedex, DHL, TNT. If you don't have, we need to charge Express fee properly.

 

Q: Can I get your best price?

A: Our goal is to provide you the best price with great quality assured in a long run. Please leave your contact information for the best quotations, we will get back to you with the best solutions as soon as we can.

Hot Tags: astm a 53 carbon schedule 40 steel pipes, China astm a 53 carbon schedule 40 steel pipes manufacturers, suppliers, factory, seamless carbon steel pipe for mining machinery, Alloy Steel P5 T5 Pipes Tubes, Geological Seamless Pipe, ASME A106 Gr B Pipe, Seamless Carbon Steel Pipe, A53 Rectangular Pipe

Send Inquiry

(0/10)

clearall