
Seamless Carbon Steel Pipe
Size range: 1/8" - 26"
Schedules: SCH20, SCH30, SCH40, STD, SCH100, SCH120,SCH160,XXH
Gnee Steel (Tianjin) Co., Ltd. is one of the most reliable manufacturers and suppliers of seamless carbon steel pipe in China, also supports customized service with low price. Welcome to wholesale discount seamless carbon steel pipe for sale here from our factory. Contact us for free sample.
seamless cS pipe Description
Seamless carbon steel pipe is made from steel ingot or solid billet by piercing into a rough tube, and then produced by hot rolling, cold rolling, or cold drawing.
Classification of seamless carbon steel pipe: Seamless steel pipe is divided into two categories: hot rolled and cold rolled (drawn) seamless steel pipe.
|
Product name
|
Seamless Carbon steel pipe
|
|
|
Outer diameter
|
1/2''-8'' (round)
|
20x20--200x200mm(square)
|
|
Wall thickness
|
1.3mm-10mm
|
/
|
|
Length
|
5.8m/6m/12m or customized
|
|
|
Standard
|
10# 20# 35# 45# 16mn
|
|
|
Zinc coating
|
Pre galvanized : 30-120g/m2; Hot dipped galvanized : 200-500g/m2
|
|
|
End finish
|
Plain/ beveled ends or threaded with sockets/coupling and plastic cap or grooved
|
|
|
Usage
|
Scaffolding pipe, Structure pipe, Fence post/Door pipe, Furniture, Low
|
|
|
Inspection
|
With hydraulic testing, eddy current and infrared test
|
|
|
Packing
|
In bundles, packed in woven bag; in loose; or request.
|
|
|
Delivery time
|
Within 20days or as your request
|
|
|
Payment Terms
|
T/T or L/C at sight
|
|

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a steel group company. We have been producing steel pipes since 2008 and exporting since 2010. We have exported to more than 150 countries and regions.
Q2: What is your quality like and how do you guarantee it?
A: All the products we offer are high-quality primary products. Our company is ISO9001:2008 certified, and each product undergoes 4-5 testing processes. We welcome customers or third-party inspection organizations to visit our factory for inspection.
Q3: What is your delivery time?
A: For stock products, we can ship the goods to the port of loading within 3-14 working days after receiving the deposit. For production orders, it usually takes 15-30 working days after receiving the deposit.
Q4: What are your payment terms?
A: T/T, L/C.
Hot Tags: Seamless Carbon Steel Pipe, China Seamless Carbon Steel Pipe manufacturers, suppliers, factory, Geological Steel Pipe, Geological hollow section, Fluid Seamless Steel Pipe for Fluid Transportation, ASTM A106 Pipeline, seamless cold drawn mild steel tubes, hollow section boiler pipe
Send Inquiry









