
SA192 Gi Steel Pipe
ASME SA192 / ASTM A192 is a boiler tube used in high pressure environments for use in super heaters, water panels, heat exchangers, condensers, marine applications, refineries, paper and pulp, petrochemical applications, pressure vessels and general Engineering Applications. It is also used in coal, thermal and petroleum power plants.
Gnee Steel (Tianjin) Co., Ltd. is one of the most reliable manufacturers and suppliers of sa192 gi steel pipe in China, also supports customized service with low price. Welcome to wholesale discount sa192 gi steel pipe for sale here from our factory. Contact us for free sample.
A192 Steel Pipe Description
ASTM A192, like ASME SA-192, is a standard specification covering carbon steel boiler and superheater tubes for high pressure applications. Steel pipe sizes and thicknesses typically offered per ASTM A192 are: 1/2″ to 7″ [12.7 mm to 177.8 mm] outside diameter, 0.085″ to 1.000″ [2.2 mm to 25.4 mm] minimum wall thickness.
| After-sales Service: | 24 Hours Online |
|---|---|
| Warranty: | 30 Years |
| Type: | Welded |
| Technique: | Cold Drawn |
| Surface Treatment: | Black |
| Section Shape | Square, Rectangular, Round, |
galvanized metal pipe Chemical Composition:
|
Element |
Grade A1 |
Grade C |
|
C% |
Max. 0.27 |
Max. 0.35 |
|
Mn% |
Max. 0.93 |
0.29-1.06 |
|
P% |
Max. 0.035 |
Max. 0.035 |
|
S% |
Max. 0.035 |
Max. 0.035 |
|
Si% |
Max. 0.10 |
Max. 0.10 |
hot dip galvanized pipe Mechanical Properties:
| Item |
Grade A1 |
Grade C |
|
Tensile Strength Loading Ksi (Mpa) |
min 60(415) |
min 70(485) |
|
Yield Strength loading Ksi (Mpa) |
min 37(255) |
min 40(275) |
|
Elongation(50mm)% A |
min 30 |
min 30 |
|
Hardness |
Max 79HRB |
Max 89HRB |
About us
GNEE Group is one of the leading boiler tube manufacturers and suppliers in China, if you want to buy or import the best quality astm a210 boiler tube professional companies, factories, sellers and exporters, or you are inquiring about steel brands, please feel free to contact us Contact us.
Through technology research and development and product upgrading, GNEE Group has greatly improved product quality and performance, comprehensively improved construction quality, and comprehensively realized industrial modernization, standardization, standardization, and branding. We will forge ahead and make unremitting efforts to accelerate our efforts to become a first-class comprehensive enterprise with global competitiveness. Promoting the development of China's environmental protection industries and enterprises with good social and economic benefits is our business goal.

GNEE Customers

GNEE Exhibition

Pipe inspection

Packaging and Shipping

FAQ:
Q1: What are your terms of payment?
A1:30% T/T deposit in advance, 70% T/T balance within 5 days after B/L copy, 100%.Irrevocable L/C at sight, 100% Irrevocable L/C
after receiving B/L 30-120 days, O/A.
Q2: How is your technical support?
A2: We provide lifetime online support through Whatsapp/ Skype/ Wechat/ Email. Any problem after delivery, we will offer you call anytime.
Q3: What's your terms of payment?
A3: 30%T/T as the upfront deposit, 70% before delivery, We will show you the photos and package before you pay the balance.
Q4: What are the terms of delivery?
A4: EXW, FOB, CFR, CIF, DDU
Hot Tags: SA192 Gi Steel Pipe, China SA192 Gi Steel Pipe manufacturers, suppliers, factory, Rectangular Carbon Tube, Q235 rectangular pipe, Welded H62 Cold Drawn Steel Pipe, GI Square Pipe, Q235 Rectangular Carbon Tube, rectangular pipe
Send Inquiry








